University steel building

Working has subcontractor, alongside a mechanical and electrical contractor, we helped design a building suitable for housing plant for heating the Erasmus Darwin energy centre at the Clifton campus, Nottingham Trent university.

  • Case study of university steel building frame work inside front

The building needed designing with a specific layout of plant in mind, the bespoke design engineered to accommodate a complex plant arrangement.

The building required vented sheets to enable air flow through the building, there was also a requirement for louvres for connecting to air intake on the plant machinery.

There was a lot of pipe work protruding through the side cladding which required flashing around, this was carried out when all the pipe work had been positioned.

Steel Building Price GuideGet your free steel building pricing guide, simply fill in your details and look out for our email.

If you would like to talk to a steel building expert about your project, contact our team on 01664566119 or book your consultation.

Comments are closed.