University steel building

Working has subcontractor, alongside a mechanical and electrical contractor, we helped design a building suitable for housing plant for heating the Erasmus Darwin energy centre at the Clifton campus, Nottingham Trent university.

  • Case study of university steel building

The building needed designing with a specific layout of plant in mind, the bespoke design engineered to accommodate a complex plant arrangement.

The building required vented sheets to enable air flow through the building, there was also a requirement for louvres for connecting to air intake on the plant machinery.

There was a lot of pipe work protruding through the side cladding which required flashing around, this was carried out when all the pipe work had been positioned.