After completing a storage building in 2013 and an office/showroom in 2015 we are back in 2017 to complete the third phase of development.

This is an extension off the side of the first storage building and would require designing to incorporate a dock loading facility.

The first stage was to complete the retaining wall on two sides of the site, cutting into the bank and allowing the building levels to remain the same through the site. It was important for the buildings to link up, allowing products to be moved easily around inside.

The overall drainage scheme had been planned when the first phase was done, so it meant that the drainage could be put into the existing system.

We are currently working on this project, so come back soon to see the progress!

You can see progress so far in the video above.