What footings do you need for a steel framed building?

They will vary in size depending on the size, but all buildings require a footing at the base of each post, but the technique does vary between hot and cold rolled buildings.

Our cold rolled buildings will require the footings and concrete floor to be poured at the same time; the structure will then be bolted down to the floor

Hot rolled buildings require a footing at the base of each column, the size of which is engineered depending on the size of the building; the floor will then normally be poured when the building is completed.

 